Over the last several years, Kuramochi kensetsu has evolved as a prominent engineering and construction services company through various projects.




Project name: Nakadai Solar Power Plant
Location: Nakadai, Naka-city, Ibaraki, Japan
Duration: 4-5 months
Year of construction: 2018
Area: 16,000 square meter site field
Nominal output: 1.663 MWp
Civil works:
Gutter, Excavated soil volume, Water collecting basin, Penetration layer soil etc..
The civil engineering work was done in parallel with the mechanical work.